Sazonov Yamal LNG. Reviews: "Yamal LNG", Russian gas company. Yamal LNG – Shift Job Search: Latest Vacancies

Dmitry Lekuh

Novatek has begun construction of the fourth stage of the Yamal LNG liquefied natural gas plant.

The fourth production line will be much smaller than the previous three. The capacity of the fourth line will be about nine hundred, maximum 950 thousand tons of liquefied natural gas per year. For comparison, the planned capacity of the first line is five and a half million tons.

Nevertheless, the launch of the construction of a new line for the industry is of great importance.

And that's why.

Previously, $1.6 billion worth of key liquefaction equipment was supplied to us by Chinese comrades. The design, supply of equipment, materials and components, construction and commissioning were carried out by Yamgaz SNC, a consortium of the French Technip and the Japanese JGC Corp. Turbocompressor equipment was supplied by the American General Electric. Natural gas was purified under license from the BASF chemical concern, LNG storage facilities were built by the French from Vinci, and Japanese Yokogawa Electric was involved in integrated control and safety systems (ICSS).

At that time, Russian enterprises simply did not have their own technologies of a similar level.

The reason: our country as a whole and the flagship enterprise of the industry, Gazprom, in particular, historically developed primarily the pipeline direction. LNG in the Russian gas industry was rather an auxiliary task. The goal was rather integration into sales networks in traditional markets (however, the markets turned out to be by no means open).

By the middle of the 2000s, it became clear that it was necessary to develop the South Tambeyskoye field and build a monstrous liquefaction plant in the Yamal Sabetta. Russia understood that a new global redivision of the world energy markets was beginning. And miss this strategically promising direction, like LNG, our country, of course, simply did not have the right.

And Novatek, just buying the best equipment and the best technologies at that time, was absolutely right. And we must be absolutely grateful to our Japanese, and our Chinese, and our French partners.

But now times have changed and trends have changed.

And the fourth line will be fully implemented on the basis of the proprietary liquefaction technology developed by Novatek, the Arctic Cascade. According to the head of the company L. Mikhelson, supplies for it will be entirely from Russian manufacturers.

In fact, this line is a pilot. And after running on it, the main part of the equipment for the company's second plant for liquefying natural gas - Arctic LNG-2, quite comparable in volume to Yamal LNG - will be localized in Russia by 2020.

In fact, we are present at a very important event for the Russian National economy an experiment that business has no right to fail.

Generally speaking, what happened in Nizhny Novgorod Vasily Osmakov, deputy head of the Ministry of Industry and Trade, called the meeting with the participation of Novatek, Rosatom and the largest equipment suppliers not by chance "the first working meeting on import substitution in LNG production."

We are talking about gigantic volumes and, accordingly, gigantic money. Russia's share in the LNG markets should, by definition, be no less than Russia's share in the world's natural gas reserves, and this is only about 23 percent in terms of explored volumes.

And in the opinion of Andrey Nikipelov, the head of another major “interested party” in import substitution, the head of Atomenergomash (the machine-building division of Rosatom), Andrey Nikipelov, the total investment Russian companies in equipment for the production of LNG until 2030 is estimated at about 80-100 billion dollars.

For comparison: neighboring Ukraine is now hysterically rushing about, realizing that in the next few years it needs to give a figure four to five times smaller, about 20 billion dollars. And it seems to her completely cosmic, and Ukraine does not even theoretically understand where to get this money.

The Russian gas industry has that kind of money and is ready to pay.

And the choice here is not "to pay or not to pay" (this is just a production necessity for conquering world energy markets), but "to pay for what": either investing in your own industry or buying abroad.

But the country cannot rely on the second option now.

From the top industrial places where I would really, really want to go, or the so-called my prom short list-10, Yamal LNG has always been in the forefront, and now my dream is already a reality, I on the Yamal Peninsula beyond the Arctic Circle in Sabetta.

The Yamal LNG project is a whole complex that includes own resource base based on the Yuzhno-Tambeyskoye field, a number of production facilities, an infrastructure component, including the Arctic port (plus, a transshipment base will be created in Belgium in the city of Zeebrugge for gas deliveryduring periods of lack of navigation along the Northern Sea Route) and a modern airport to boot. The construction of a unique plant takes place in the difficult climatic conditions of the Arctic, the entire infrastructure was created almost from scratch, and already in 2017 the first stage of a gas liquefaction plant with a capacity of 5.5 million tons per year will be launched. At the moment, the overall readiness for the entire project is somewhere around 51.3%, and the readiness for the first stage is 64.4%. So, friends, today we have another exclusive.

3. This is how the construction site of a gas liquefaction plant looks like now

Liquefied natural gas, or LNG for short, as it is usually called in a professional environment (English Liquefied Natural Gas, abbr. LNG) is ordinary natural gas (mainly methane, CH4 by 95%, plus ethane, propane, butane, nitrogen, which account for the remaining 5%), chilled to a temperature of -162 ° C (the so-called liquefaction temperature) for easy storage and transportation in liquid form. LNG is an odorless and colorless liquid, the density of which is half that of water. It is non-toxic and non-flammable. During regasification (return of gas to its original vapor state) from one cubic meter liquefied gas about 600 cubic meters of conventional natural gas is produced.

The first pilot plant for the liquefaction of natural gas was built back in 1912, and in 1941 in Cleveland, Ohio (USA), its large-scale production was first launched. In Russia, the first such plant was built in 2006 in the village of Prigorodnoye in the south of Sakhalin. Its capacity is 9.6 million tons of LNG. The operator of the Sakhalin-2 project is Sakhalin Energy (the main shareholders of Gazprom Sakhalin Holdings B.V. (100% subsidiary of PJSC Gazprom) - 50% plus one share, Shell Sakhalin Holdings B.V. - 27.5%, Mitsui Sakhalin Holdings B.V. - 12, 5% and Diamond Gas Sakhalin B.V. - 10%). So, our YamalLNG plant will be the second in this list. When asked about competition, the answer was that we are not competitors, already now about 96% of LNG is chartered by customers on a long-term basis, mainly for deliveries to countries Asia-Pacific region (APR).

The South Tambey gas condensate field was discovered in 1974. Its proven and probable reserves according to PRMS standards as of December 31, 2014 amount to 926 billion cubic meters. m. of gas. The development license was issued until 2045 and belongs to OAO Yamal LNG. It is planned to drill 208 production wells with a horizontal ending at 19 well pads. Already (as of May 1, 2016) drilling of 50 production wells has been completed, which is 86% of those required to launch the first stage of the LNG Plant. Drilling rigs "Arktika" and "Aurora" manufactured by Uralmash (Yekaterenburg) operate at the fields.

The gas liquefaction plant will consist of three gas liquefaction process lines with a capacity of 5.5 million tons per year each, i.e. the total capacity will be 16.5 million tons. As I said above, the first stage will be launched in 2017, the next in 2018 and 2019, respectively. Now 100% of the foundations of the first stage have already been prepared, and the main equipment (including a cryogenic heat exchanger) has also been delivered.

The share capital in OAO Yamal LNG is distributed as follows: our controlling shareholder is NOVATEK, 20% went to the French in the person of Total, the Chinese also did not miss their happiness, CNPC owns 20%, and the Chinese Silk Road Fund (SRF) - 9.9%.

Some interesting statistics. The total weight of the Yamal LNG plant is 650 thousand tons. Of these, 500 thousand tons are just technological modules, and 150 thousand tons are overpasses. The entire plant will consist of 360 modules, of which 111 will be technological modules. In 2015, 7 modules were delivered, thereby checking the logistics chain, in 2016 they plan to deliver 79 modules to the site, which will allow the launch of the first stage.

As for the technological process. The hydrocarbon mixture from the wells will be fed to a single integrated complex for the preparation and liquefaction of natural gas through gas gathering stations. Where will the separation first take place, i.e. separation of mechanical impurities, water, methanol and condensate from gas. After that, the separated gas will enter the liquefaction process lines and sequentially undergo purification from acid gases and traces of methanol, drying and removal of mercury, extraction of fractions of ethane, propane and heavier hydrocarbons. The purified gas is then further pre-cooled and liquefied. And then LNG is stored in special closed-type isothermal tanks.

14. The first production line blooms behind me

16. Future storage tanks for liquefied gas

17. We were very lucky, they let us inside, in a few weeks it will be brewed and all the others missed their chance.

22. As we can see, there will be four of them (4x160,000 m3). The total readiness for tanks at the moment is 75.3%. The first two will be fully completed by November 2016.

29. The power plant will be equipped with eight gas turbine units SGT-800 (Siemens) with a capacity of 47 MW each and four heat recovery modules (UTO-40) produced by the same Siemens company, with a nominal thermal power of 40 MW each.

36. At the moment, the overall readiness of the Yamal LNG GTPP is 60.2%. The installation of gas turbine units (GTU) 1-4 has already been completed. The launch of the first phase is scheduled for this year. JSC VO Technopromexport is responsible for the construction.

37. And so that the weather does not wave at the construction site, chic production and assembly shops were built here.

So, why is Yamal LNG so good? Firstly, the plant itself is located right on the Yuzhno-Tambeyskoye field, and its reserves are huge.

Secondly, production here is much cheaper, since Mother Nature herself helps us. Yes, the climate here is harsh, of course, in most of Russia there is already a big plus in temperature, but here on May 5, when I actually arrived here, it’s minus 10. And in winter, more than 40 is the norm, but in summer you can sunbathe a little, only it passes quickly . And in these conditions, due to the low average annual temperature, less specific energy is required for gas liquefaction, which makes it possible to achieve higher volumes of LNG production compared to similar projects located in southern latitudes.

Р. S. Dear owners and shareholders, representatives of the press services of companies, marketing departments and other interested parties, if your company has something to show - "How it's done and why it's so!", we are always happy to take part. Feel free to write to us yourself[email protected] and tell us about yourself by inviting us to visit YOU. Take a cue from the leaders!

More than 150 organizations have already opened their doors to us, and here are our reports from there:

Why our industry is the best in the world: http://zavodfoto.livejournal.com/4701859.html

ZAVODFOTO - Walking around the country! - ENERGY OF RUSSIA: http://zavodfoto.livejournal.com/2133307.html

"Perm Territory - We have something to be proud of!": http://zavodfoto.livejournal.com/1823939.html

We are always glad to new friends, add and read us in:

And I was again drawn to the north, far, far, beyond the Arctic Circle to the Yamal Peninsula to Sabetta, where one of the largest projects in the oil and gas sector in recent years, Yamal LNG, is being implemented. For understanding, $22 billion has already been invested in it (about $27 billion is planned in total). The plant for the production of liquefied natural gas (LNG) will operate on the resource base of the Yuzhno-Tambeyskoye field, and its capacity will be 16.5 million tons per year. In May last year, I was already in these parts, then the overall readiness for the entire project was somewhere around 51.3%, and the readiness for the first stage was 64.4%. How things are today, I will show and tell everything, since NOVATEK PJSC, the project shareholder, is very open in this matter and is not afraid of me :).


2. I experienced deja vu for a moment. The speaker this time was Dmitry Monakov, already familiar to me, the first deputy director of the project.

3. And immediately to the numbers. At the moment, the overall readiness for the entire project is 77-78%, and for the first stage of the plant it is already 88%. This is how the first stage should look like by the end of the year.

The Yuzhno-Tambeyskoye field is located in the North-East of the Yamal Peninsula and belongs to the West Siberian oil and gas province. It was opened back in 1974. The field consists of 5 shallow gas reservoirs and 37 deep gas condensate reservoirs. The depth of deposits varies from 900 to 2850 m. The size of the deposit from south to north is about 70 km and from east to west - about 30-35 km. In total, it is planned to drill 208 production wells with a horizontal ending at 19 well pads at the field (the necessary 58 wells have already been drilled for the first stage, and a total of 78 have already been drilled at the moment. At the same time, only 35 wells are needed for the second stage, and about 35 for the third -38 The rest will have to maintain the necessary flow for the full operation of the plant). Proved and probable reserves are about 1.3 trillion cubic meters of gas and 60 million tons of condensate. The field development license belongs to Yamal LNG and is valid until 2045. This resource base should be enough for at least 25-30 years of confident work.

The Yamal LNG plant will consist of three gas liquefaction lines with a capacity of 5.5 million tons per year each, i.e. the total capacity will be 16.5 million tons. In addition, the production complex will include installations for the fractionation of liquefied hydrocarbon gases, storage parks for stable condensate and refrigerants, as well as other general plant engineering systems and flare installations.

The entire plant will be built from 360 modules, of which there will be 111 technological modules. The first such module was delivered to the construction site on September 21, 2015. This basic equipment is produced in 7 Chinese and 3 Indonesian shipyards. The total weight of the LNG plant is 650 thousand tons, of which 150 thousand tons are racks, and 500 thousand tons are the process modules themselves.

In autumn 2016, all 78 modules required for the first stage, including the central control room, were delivered to Sabetta. Nevertheless, 57 modules (for the second and third stages) are still envying the territory of the plant, which will appear here according to the plan before the end of 2017.

8. On this day it was below minus 30, and at the height there is still a very strong wind, but can this stop me, who is in love with our industry? Therefore, almost blindly, since all the glasses are fogged up, I conquer and conquer all the vile heights of the plant :-)

9. Yes, well, in a year they did business here, what they just didn’t build, well done, keep it up, they definitely surprised me!

11. They didn’t hesitate, they walked inside ...

The start of LNG production on the first line is scheduled for 2017, while the first deliveries of liquefied natural gas from here should take place before the end of this year.

16. Liquefied gas storage tanks, there are four of them (4x160,000 m3). In permafrost conditions, each tank is built on a foundation of 948 piles, each 24 meters deep, with a thermal stabilizer installed next to each. In 2016, all of them were built and passed the necessary hydraulic tests. The main platforms of pumping equipment are installed on the first two tanks.

18. We climbed one of the tanks. Their height is 54 meters. By the way, last year I was inside it, and now the way there is booked.

20. An important component of the project is its own generation. A new gas turbine power plant with a capacity of 376 MW will be built here, the thermal power plant will be 160.0 MW. You see, on the right you can see an orange-blue-white building with pipes, this is it. The first gas turbine with a capacity of 47 MW should be launched this spring. Thus, it will create an energy foundation for the launch of the first stage of the plant. It's no secret that I'm not indifferent to energy, so I'll write a separate post about it.

Concerning production process briefly it can be described as follows. From the wells, gas is transported to the plant through a pipeline system. They are above ground. Once on the territory of the LNG plant, the gas is slightly prepared so that the liquefaction process takes place in the best possible way. To do this, condensate is separated from the gas (these are liquid fractions that are simply dissolved in the gas at pressure in the reservoir and are in a state like steam), methanol (used for production, such as lubricants) and other unnecessary impurities. By the way, condensate also remains in business, it goes through the pipeline system to special tanks (there are 3 tanks of 50,000 m3 each for this) and when a special tanker arrives, it is also shipped to consumers. Pure (prepared) ideally dry gas is supplied for liquefaction and then for storage in tanks. In addition, in order to obtain a high-quality end product, carbon dioxide and mercury released during the purification process are removed.

On November 13, 2016, cryogenic heat exchangers for the second and third stages of the plant were delivered to Sabbata, but for the first line, a similar heat exchanger has already been installed at the right place. The main cryogenic heat exchanger is considered the "heart" of the LNG plant, because it is inside it that the final cooling of natural gas to a liquid state is carried out. The heat exchanger itself is made of aluminum alloy and consists of several tube bundles wound around a central core. The total length of the pipes exceeds 43 km.

35. Now about 27,500 people work at the construction site.

41. By the way, thanks to Yamal LNG, the cargo traffic along the Northern Sea Route has doubled. And only in sea ​​port Since 2012, more than 10 million tons of cargo have already been delivered to Sabetta.

44. At the moment, the construction of the preparatory period facilities necessary for the delivery of LNG plant modules has been completed. Six cargo berths have been built and the construction of berths for loading LNG and gas condensate is being actively continued.

The Yamal Peninsula is actively developing new center gas production, which in the future will become one of the main ones for the development of the Russian gas industry. Up to 360 billion cubic meters will be produced in Yamal. m of blue fuel.

Place of Birth

trillion m 3 of gas

billion tons of gas condensate

million tons of oil

Place of Birth

trillion m 3 of gas

billion tons of gas condensate

million tons of oil

  • Bovanenkovskoye, Kharasaveyskoye stable condensate per year.
  • Tambey industrial zone

    It consists of six fields: Severo-Tambeyskoye, Zapadno-Tambeyskoye, Tasiyskoye, Malyginskoye (licenses belong to the Gazprom Group), South-Tambeyskoye and Syadorskoye.
  • Southern industrial zone

    Includes nine fields: Novoportovskoye (the license belongs to the Gazprom Group), Nurminskoye, Malo-Yamalskoye, Rostovtsevskoye, Arkticheskoe, Sredne-Yamalskoye, Khambateyskoye, Neytinskoye, Kamennomysskoye. The zone is considered as a priority oil production facility with a maximum annual level of 7 million tons.
  • A new generation gas transmission corridor from the Bovanenkovskoye field to Ukhta has been created for the unified gas supply system of Russia. Year-round export of oil is carried out through the sea oil terminal"Gateway to the Arctic".
  • Infrastructure

    A full-fledged system of industrial and life support has been formed: roads, power plants, a shift camp, industrial bases, Railway"Obskaya - Bovanenkovo ​​- Karskaya" with a length of 572 km, airport.

The number of deposits is 32.

Total reserves and resources of all fields on the Yamal Peninsula: 26.5 trillion cubic meters. m of gas, 1.6 billion tons of gas condensate, 300 million tons of oil.

Video about the Yamal megaproject, 3 minutes

Mining in Yamal:

In 2017 - 82.8 billion cubic meters. m of gas.

In the future - up to 360 billion cubic meters. m of gas per year.

Structure of the megaproject

Bovanenkovo ​​industrial zone

It has the main production potential and includes three fields - Bovanenkovskoye, Kharasaveyskoye, Kruzenshternskoye (the licenses belong to the Gazprom Group). Gross production here is estimated at 217 billion cubic meters. m of gas and 4 million tons of stable condensate per year.

Tambey industrial zone

It consists of six fields: Severo-Tambeyskoye, Zapadno-Tambeyskoye, Tasiyskoye, Malyginskoye (licenses belong to the Gazprom Group), South-Tambeyskoye and Syadorskoye.

Southern industrial zone

Includes nine fields: Novoportovskoye (the license belongs to the Gazprom Group), Nurminskoye, Malo-Yamalskoye, Rostovtsevskoye, Arkticheskoe, Sredne-Yamalskoye, Khambateyskoye, Neytinskoye, Kamennomysskoye. The zone is considered as a priority oil production facility with a maximum annual level of 7 million tons.

Hydrocarbon transportation system

To transport gas from the Yamal Peninsula to the Unified Gas Supply System of Russia, a new generation gas transmission corridor was created from the Bovanenkovskoye field to Ukhta. Year-round export of oil is carried out through the offshore oil terminal "Gate of the Arctic".

Infrastructure

A full-fledged industrial and life support system has been formed: roads, power plants, a shift camp, industrial bases, the Obskaya-Bovanenkovo-Karskaya railway with a length of 572 km, and an airport.

Project implementation

The largest Yamal field in terms of proven gas reserves is Bovanenkovskoye. The primary object of development is the Cenomanian-Aptian deposits. In 2012, the first gas field (GP-2) was commissioned at the field, in 2014 — the second (GP-1), in 2018 — the third (GP-3). The total design capacity of the three fields is 115 billion cubic meters. m of gas per year. In the future, with the commissioning of the Neocomian-Jurassic deposits, the design capacity of the Bovanenkovskoye field will increase to 140 billion cubic meters. m of gas per year.

Put into operation in 2012 main gas pipeline Bovanenkovo ​​- Ukhta, at the beginning of 2017 - the Bovanenkovo ​​- Ukhta - 2 gas pipeline.

Work on a rotational basis at the Yamal LNG project in Sabetta. The vacancies of which are posted on the official website. The professions in demand for men and women are a driver, a technician, a mechanic, a welder, an installer, an electrician, a commandant, a cook, etc. In 2019, Yamal LNG OJSC plans to put into operation one production line of a liquefied gas plant every year, therefore question, Yamal LNG - vacancies, at the moment it is very relevant.

Shift work and vacancies Yamal LNG in the shift camp. Reviews of employees about work in the North. How to get a job at Sabetta as a shift. Contacts of the personnel department of the direct employer. Are there vacancies for women. Professions handyman, driver, electrician. Vacancies of the YAMAL LNG company for shift work for 2019 at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. You can find out how to get a job in a company, what kind of work they offer in the North on the official website. And also on specialized resources for posting vacancies.

Fill out your CV ➤

Contacts of the personnel department for employment, phone, current vacancies are available on the official website of Yamal LNG http://yamallng.ru/career/open_vacancies/ - select an open vacancy from the list and on this page there will be a button "send finished resume". The text and vacancies posted below are for reference only.

Work on the Yamal LNG on a rotational basis

The company pursues a personnel and social policy in compliance with the most stringent and highest world standards. Yamal LNG - vacancies for representatives of various specialties, workers from different countries take part in the implementation of the project.

Fill out your CV ➤

In addition to the construction of the plant, a modern airport is being built for international communication and seaport, as well as other transport infrastructure facilities. The construction of the plant is carried out in several stages, the launch of which is planned in 2019-2019. Up to 16 million tons of LNG will be supplied annually to Europe and the Asia-Pacific region, in addition, up to 1.2 million tons of gas condensate will be sold.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with a full social package, medical insurance, and there is an opportunity to take advantage of health resorts. The company is actively developing, therefore qualified workers of various specialties are constantly required.

Today, there is a large selection of vacancies, and you can apply for one that matches your education and work experience. The most relevant vacancies: managers, IT specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers different directions works, operators of technological installations.

Yamal LNG - vacancies for specialists in various specialties. The main advantages that allow the company to successfully compete in today's market:

  • deposits are located on land and have a high concentration;
  • development technologies are well developed;
  • studied geology;
  • minimum funds are spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and more governmental support.

Many vacancies require people with similar work experience, but there are also those where they accept without work experience, for example, laborers, drivers of various driving categories, there are also vacancies for women.

Vacancies in gas production in Yamal

It is planned to produce gas from 208 wells, it will be supplied to the market in liquefied form, therefore, starting from 2017, three technological lines are commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

An unloading rack with two berths is being equipped in the port of Sabetta. Cargo berths are already working, so delivery building materials held continuously throughout the year. This project provides for the construction of the largest LNG plant in Russia.

it largest enterprise on the Yamal Peninsula, which provides people in this region high paying job, the average salary is 120,000 rubles. Yamal LNG - vacancies for shift work. Usually shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to leave your family, your usual life for a while and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will be relevant for a long time to come.

Watch in Sabetta with accommodation

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, recreation and leisure of workers. There are cozy canteens, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry, living quarters, a warm parking lot, a new canteen are being built, so actual vacancies are appearing. More than 15,000 people are already involved in the implementation of this project, and if you hurry, you can soon join them.

Feedback from employees about working in the North

The project provides for the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the Yuzhno-Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. m. As part of the Project, a transport infrastructure is being created, including a seaport and an airport international class Sabetta.

Fresh selection of Yamal LNG vacancies for today

Welding engineer 1st category

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Technical supervision, carrying out and coordination of work to determine the compliance with the established requirements of the welding work performed and the object (welded structure) during construction ...
…in oil and gas, oil refining and/or LNG production facilities. Knowledge of welding methods: RD, RAD. MP, MPG, AF, AAD.

Chemical engineer / Chemist engineer


Carrying out the full range of analyzes offered by the chemical analysis laboratory, including the distribution of tasks among the laboratory staff. Preparing the laboratory for accreditation…
Higher education in the field of chemistry and chemical technologies. The following courses are preferred: Chemistry for the Oil and Gas Industry, Laboratory Analysis Courses…

Electrical engineer (category 1) / supervisor (power supply section)

OAO Yamal LNG Sabetta (Yamal-Nenets Autonomous Area)
Control and supervision of compliance current legislation, normative legal acts, requirements of administrative and normative documents to the technical condition of electrical installations: PS ...
Higher professional education(electricity supply / energy). Experience: At least 3 years of experience in a similar position. English language- free.

Lead Power Engineer, Power Supply Division

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of organizational and technical support of the full cycle or individual stages of operation of electrical installations: Substation 35/10 (6) kV, ZRU-10 (6 ...
Higher professional education (electricity supply / energy). Experience in the specialty: at least 3 years of experience in a similar position.

IT Trainer (Technical Support)

OAO Yamal LNG
Moscow, Prospekt Vernadskogo and 2 more CAREER.RU
Assembly, installation and modernization of the PC. Diagnostics of hardware and software in order to detect faults. Repair of PC hardware by replacing a faulty ...
Knowledge of PC hardware and peripherals. Knowledge of Windows XP / Vista / 7. Knowledge of basic network protocols and services.

Chemical analysis laboratory assistant

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Performing timely sampling in strict accordance with the regulatory and technical documentation and the sampling schedule. Carrying out scheduled analysis of gas samples, gas…
Higher or secondary special education in the field of chemistry and chemical technologies or secondary special education, laboratory assistant certificate 4th/5…

Treatment plant operator / chemical water treatment operator (water treatment plant, 3rd category)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Implementation of start-up and shutdown of water treatment facilities, guided by the instructions of the senior operator of the control panel. Ensuring safe operation technological equipment and pipelines.
Education secondary special or higher, preferably in the specialization of V&K. Availability of a qualification certificate for the operator of treatment facilities / cleaning operator Wastewater/ apparatchik…

Welding master

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Production of welded structures (products, products: metal structures, pipelines, equipment) in accordance with established requirements to quality. Analysis of the plan / schedule for the production of welded…
Secondary vocational education. Experience in certification of welding equipment and technologies. Experience in leading a link (team) of welders during welding (construction, repair) of responsible ...

Leading Specialist of the Information Systems Support Group (Sabetta, YNAO)

OAO Yamal LNG
Sabetta (Yamal-Nenets Autonomous Okrug)
Administration, work optimization information systems companies (SED Directum, 1C, Monitoring of drilling, project management systems). Administration of MS SQL 2008 DBMS…
Higher technical education. Practical experience: - Installation, configuration, administration, optimization of configurations based on 1C: Enterprise 8.2, 8.3 ...

MECHANICAL ASSEMBLY WORKER

responsibilities:

Execution of production tasks received from the master of the mechanical repair workshop for the repair of equipment and its post-repair testing;
Installation, configuration, diagnostics (troubleshooting), repair and Maintenance mechanical equipment (pumps of various types, valves, gate valves, etc.);
Providing daily reporting on the work done, participating in safety meetings and informing the supervisor of any malfunctions or deviations;
Compliance with the requirements for the issuance of work permits;
Assistance in the preparation of work permits;
Receipt at the warehouse of spare parts and accessories necessary for the performance of work;

requirements:

Secondary special education;
Possession of a locksmith's certificate mechanical assembly works(minimum 3 digits) required;
5 years experience as a repair technician in a workshop and in field conditions at the enterprises of the oil and gas and petrochemical industries;
Experience with systems for issuing work permits;
Skills in determining the necessary spare parts for repair / restoration work and experience in compiling and placing requests for them;
Mandatory: experience in the revision and repair of shut-off and control valves (namely: ball and plug valves, gate valves, valves, safety valves, spring and impulse (pilot), control valves, check valves, etc.);
Experience with mechanical and hydraulic systems;
Proven ability to use hand and special tools (centering, screwing, assembly and disassembly flange connections, for work with pipelines and flexible pipes).

HEAT NETWORK SERVICE WORKER

The construction of the natural gas liquefaction plant is carried out in three phases with the launch in 2017, 2019 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate with supplies to the markets of the Asia-Pacific region and Europe.
The project is being implemented by OAO Yamal LNG, whose shareholders are largest companies in the field of production and processing of hydrocarbon raw materials: OAO NOVATEK - 60%, Total - 20%, CNPC - 20%.

Personnel policy

JSC Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is implemented by representatives of various nationalities and states. common purpose and strong team are the main conditions for the successful implementation of the Project. The company creates comfortable and safe working conditions, takes care of the social security of employees, providing compensation, voluntary medical insurance, the possibility of health resorts and recreation.

Fill out your CV ➤

JSC YAMAL LNG is an actively developing company interested in cooperation with highly qualified specialists.

Vacancies watch on Sabetta

Moscow (5)
MANAGER OF INVESTMENT PLANNING AND FINANCIAL ANALYSIS DEPARTMENT (DECRET RATE)
CHIEF SPECIALIST OF THE DEPARTMENT OF INFORMATION TECHNOLOGIES (MOSCOW)
ENGINEER OF 1 CATEGORY
HVAC engineer
CHIEF SPECIALIST OF THE FINANCIAL AND ECONOMIC DEPARTMENT
Sabetta/LNG plant (46)
________________________________________
DEPUTY HEAD OF THE CORROSION GROUP
HEAD OF THE SECTION OF GENERAL FACILITIES
DEPUTY HEAD OF THE GROUP OF ELECTRICAL EQUIPMENT OF GENERAL FACILITIES, POWER PLANT, STORAGE AND SHIPMENT OF FINISHED PRODUCTS
SENIOR ELECTRIC ENGINEER (PROCESS LINES SECTION)
ENGINEER 1 CATEGORY (EQUIPMENT OVERHAUL GROUP)
Mechanical engineer of the 1st category (designer)
Senior Civil & Structural Engineer
ENGINEER FOR EQUIPMENT MAINTENANCE PLANNING AND PPR
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
REPAIR ENGINEER 1 CATEGORY PRODUCTION AND TECHNICAL DEPARTMENT
PROJECT ENGINEER 2 CATEGORY / JUNIOR PROJECT ENGINEER
CHEMICAL ENGINEER
ENGINEER 2 CATEGORY (JUNIOR SHUTDOWN ENGINEER)
1st CATEGORY ENGINEER / PROCESS CONTROL TECHNOLOGIST
SENIOR ELECTRIC ENGINEER (GENERAL FACILITIES)
ENGINEER-INSPECTOR 1 CATEGORY
ENGINEER-INSPECTOR 2 CATEGORIES
ENGINEER 1 CATEGORY FOR THE DEVELOPMENT OF PROCEDURES FOR THE MAIN PRODUCTION SYSTEMS AND INSTALLATIONS OF THE PROCESS LINE SECTION
ENGINEER 1 CATEGORY HVAC / HVAC ENGINEER
DESIGN ENGINEER
TECHNOLOGY ENGINEER 2 CATEGORIES
PROJECT ENGINEER / PROJECT ENGINEER
REPAIR MANAGER OF TECHNOLOGICAL EQUIPMENT
CIVIL AND STRUCTURAL ENGINEER
OPERATOR OF PROCESS PLANTS OF THE 7TH DISTRIBUTION OF THE LNG PLANT OF THE SECTION OF PROCESSING LINES
Head of estimate and contract department / Head of project service & control
CHEMICAL ANALYSIS LABORATORIST 4-5 DISCHARGE
ENGINEER 2 CATEGORY (VIBROMONITORING AND CONTROL GROUP) / JR. CONDITION MONITORING ENGINEER
OPERATOR OF TECHNOLOGICAL INSTALLATIONS (CENTRAL CONTROL PANEL) OF THE AREA OF ENTRANCE FACILITIES
HEAD OF THE GROUP OF METROLOGISTS
FAULT SCOPE ENGINEER 1 CATEGORY / NDT ENGINEER
ENGINEER 1 CATEGORY FOR PRODUCTION PLANNING
DEPUTY PROJECT ENGINEERING MANAGER
TECHNICAL ASSISTANT
SENIOR INSTRUMENT ENGINEER
Operational readiness engineer / OR&A engineer
ENGINEER OF THE CONTROL SYSTEM AND DIAGNOSIS OF THE TECHNICAL CONDITION OF THE EQUIPMENT
CORROSION ENGINEER 2 CATEGORY
OPERATOR OF PROCESS PLANTS 8 DISCHARGE OF LNG PLANT, SECTION OF PROCESS LINES
ELECTRIC ENGINEER 1 CATEGORY
HEAD OF THE LABORATORY FOR METROLOGY OF THE DEPARTMENT OF APCS AND INSTRUMENTATION
Project Engineer / Front End Project Engineer
SENIOR CHEMICAL ANALYSIS LABORATORIST
ENGINEER 2 CATEGORY (ROTATING EQUIPMENT) / JR. ROTATING EQUIPMENT SPECIALIST
ENGINEER 1 CATEGORY (OR&A ENGINEER)
Sabetta - .
________________________________________
SPECIALIST OF THE DEPARTMENT OF CONTROL OF TECHNICAL DOCUMENTATION (CLOCK 30/30)
INTERPRETER
HEAD OF ENVIRONMENTAL PROTECTION SERVICE
CHIEF SPECIALIST OF INFORMATION SECURITY DEPARTMENT (SABETTA)
DEPUTY HEAD OF THE ENVIRONMENTAL PROTECTION SERVICE
Electrician 3-4 category
Locksmith - machinist

Yamal LNG is an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional high concentration reserves located on land
well-studied geology and proven development technologies
very low development and production costs
high efficiency of the liquefaction process due to low average annual temperature
access to the markets of Europe and the Asia-Pacific region
government support, including tax incentives

Project infrastructure

The field development project provides for the drilling of 208 wells at 19 well pads. The gas produced at the field will be supplied to international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of an unloading rack with two berths in the port of Sabetta, equipped with ice protection facilities. Reinforced ice-class tankers "Arc7" will be used for LNG transportation.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is scheduled for 2017.
The main tenders have been completed and key contracts for the supply of materials and equipment and the provision of design and construction services have been concluded. More than 95% of the LNG plant's output has been contracted. The operation of cargo berths in the port of Sabetta has begun, providing year-round delivery of construction cargo. Underway production drilling and construction and installation works at the facilities of the LNG plant. At the end of 2016, the project was approximately 75% complete.

As part of the Yamal LNG project, it is planned to build the country's largest plant for processing and producing LNG (liquefied natural gas), capable of developing a capacity of about 16,500,000 tons annually based on the resources of the Yuzhno-Tambeyskoye field.
According to PRMS standards, the proven and probable reserves of the gas field are about 900 billion cubic meters. This project involves the implementation of communication paths:
sea ​​port,
transport structure,
modern airport Sabetta.

Work at Yamal LNG

OAO Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This enterprise is a joint venture, where NOVATEK owns the controlling stake, TOTAL, CNPC and the Silk Road Fund are involved.
Wage in Yamal LNG starts from 120,000 rubles.

This structure assumes a large number of jobs for . This direction widely in demand among applicants who are ready to break away from their usual life and move into conditions of hard work for a period of one month. The shift schedule is built mainly as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
The construction of the plant is planned in three phases:
2017
2019
2019
Accordingly, actual vacancies in the project will appear for a long time. Direct employers are ready to offer Better conditions for shift work in the gas industry.
The Yamal LNG plant is located above the Arctic Circle on the northern Yamal Peninsula, at the site of the South Tambeyskoye natural gas field. Construction is successfully carried out in 3 phases in 2017, 2019 and 2019. The natural gas processing project plans to annually produce liquefied gas from 16.5 million tons and up to 1.2 million tons of gas condensate for the market of the Asia-Pacific region and Europe. Job vacancies at the Yamal LNG plant will be available below.

Yamal LNG – Shift Job Search: Latest Vacancies

The shift method is becoming increasingly attractive to many applicants today due to the proposed high salary and travel to different parts of the country. Thus, vacancies at Yamal LNG are of interest to many specialists with the opportunity to consistently receive a good salary, new experience and build a successful career.

To get acquainted with such job offers, it is proposed to take advantage of the extensive opportunities that open up to users on the worldwide web on the site dedicated to employment. Lots of fresh announcements are constantly added here. Each of them indicates the basic information on a specific specialty that is of interest to applicants. According to it, it becomes clear how the offer suits the specialist in terms of salary, region of work, responsibilities and other aspects.
Yamal LNG

Yamal LNG is a gas producing company. The project is aimed at the active construction of a plant intended for the production of natural liquefied gas. Within its framework, it is planned to create the necessary facilities.

The project provides for the following areas for natural gas:

  1. mining;
  2. liquefaction;
  3. supplies.

The advantages include having a good resource base as well as a good location, which in combination allows you to achieve excellent results.

This is also facilitated by the work of highly qualified employees who work on different specialties, applying directly in practice the entire volume of their professional knowledge and practical skills.

Current vacancies

On the Internet today it is easy to find a lot of job offers in the company in the following areas:

  • operator filling station, treatment facilities;
  • laboratory assistant;
  • storekeeper of fuel and lubricants;
  • instrumentation fitter;
  • interpreter;
  • geologist;
  • gas cutter;
  • Lead Engineer;
  • process engineer;
  • head of the workshop, department;
  • Instructor;
  • technician;
  • finisher;
  • economist;
  • insulator;
  • head of laboratory;
  • accountant;
  • crane operator;
  • chemical engineer;
  • installer;
  • foreman;
  • slinger;
  • driver;
  • mason;
  • driver;
  • Chief Specialist.

From this extensive list, it becomes clear that the company requires qualified employees in many specialties. Each job at Yamal LNG for vacancies provides for its own list of requirements for candidates and professional duties.

Working conditions

The offered vacancies are of interest to applicants due to attractive conditions. So, employees are provided with everything necessary, officially registered, in accordance with all relevant labor legislation.

Benefits include offering a high and stable salary for interesting work in a friendly team with the opportunity to gain experience, new knowledge, the realization of all their professional potential, as well as advanced training. Rotational vacancies at Yamal LNG are distinguished by a convenient work schedule, long vacations, and the opportunity to travel to the regions of the country.

LNG PLANT IN YAMAL

An LNG plant with a capacity of about 16.5 million tons is being built right at the South Tambeyskoye gas field, in the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the schedule for the implementation of the project. This project will contain 3 natural gas liquefaction lines with a capacity of 5.5 million tons each year. The first launch is planned for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, which makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. the mixture from the wells of the field will pass through gas gathering networks to a single complex for gas treatment and liquefaction. Further, at the entrance of the complex there will be a separation process. The inlet facilities include units that regenerate methanol and stabilize the condensate. The separated natural gas will go to process lines, where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Further, already purified natural gas will be supplied for cooling and liquefaction. LNG will go for further storage in closed-type isothermal tanks. It is planned to build 4 tanks with a capacity of 160,000 cubic meters each. m. each. Work at the LNG plant IN YAMAL vacancies - read on.

VILLAGE SABETTA - FOR RESIDING OF WORKERS

The village of Sabetta, located on the eastern side of the Yamal Peninsula, is the stronghold of the Yamal LNG. A modern infrastructure has been created here for a comfortable stay for workers, additional life support complexes have been built: a fuel and lubricants warehouse, food storage warehouses, a reliable boiler room, cozy canteens, a medical center, a hotel, a common bathhouse, a sports complex, sewerage and water treatment facilities. Another canteen, a fire station, a laundry room, a heated parking lot, and additional residential buildings for builders are being built. At the construction stage of the Project, the number of employees is already about 15,000 people. Join and you.

Open vacancies on a Yamal LNG shift:

Locksmiths of various categories (3-6);
engineers of all categories;
machinists;
inspector engineers;
technology of all directions;
entrance facilities specialists;
locksmiths of various qualifications and levels.

In addition, vacancies are often open that do not require work experience, vacancies for laborers, drivers. Also on the project there are vacancies for women.
It should be noted that JSC YAMAL LNG is one of the most attractive employers in the industry, international class standards in social and personnel policy allow the company to offer the best working conditions on the market. A wide range of specialists from various countries. A common goal, a close-knit team are the main components for the successful completion of the project.

Specialists on a rotational basis are offered:
1. social Security;
2. various compensations (accommodation, food);
3. DMS;
4. vouchers to sanatoriums and resorts for recuperation, etc.

Urgent shift work: .

Fill out your CV ➤

Interesting VIDEO film about Yamal:

Jobs at Yamal LNG. Shift work at Sabetta