Terms of reference for the provision of services for the maintenance and repair of vehicles Name of services: Maintenance and repair of vehicles. Terms of reference for the repair of cars of the lada brand

Public corporation

Interregional Distribution Grid Company of the Center and Volga Region
Branch "Udmurtenergo"

^ Technical task

for car maintenance

for the needs of PA "Southern Electric Networks"

branch of Udmurtenergo in 2013

Izhevsk

^ 1 General requirements


    1. Place of work:


brand, model

vehicle


Quantity

Name

works


Term

Note,

PO YuES

1

UAZ-390995

76


January December

2

GAZ 27527

28

Oil change engine, gearbox, front and rear axles.

Replacing the air, fuel filter and candles.

Injection of pivots, steering joints, cardan.

Chassis defective. Express wash.


January December

    1. Carry out maintenance in accordance with the technical specifications and the vehicle operation manual.

    2. Terms of work: according to the norms, but not more than 2 calendar days.
1.4 The participant of the competition for the performance of work must have:

Certificate for the provision of car maintenance services in accordance with the state standard.

Positive work experience of at least 3 years in the provision of maintenance services for GAZ, UAZ vehicles

Having a contract for the maintenance of warranty UAZ or GAZ vehicles.

1.5 Work must be carried out in accordance with the requirements of the following NTD:

Rules for the organization of maintenance and repair of automobiles.

Vehicle operation manuals.

1.6 Work is carried out according to the order agreed with the customer.

1.7 Calculation of the cost of repairs must be carried out on the basis of a cost estimate agreed with the customer.

1.8 The contractor must guarantee the compliance of the work performed in accordance with the specifications and the requirements of the regulatory and technical documentation (NTD) and eliminate at his own expense the defects identified during the operation within the warranty period of 6 months from the date of delivery according to the act of work performed. Quality guarantees apply to all structural elements and work performed by the Contractor. The Contractor, during the warranty period of operation, eliminates defects made through his fault, at his own expense, on his own and within the time agreed with the Customer.

2. Requirements for the performance of work

2.1 Carrying out repairs and acceptance of the work performed are carried out in accordance with the technical specifications and the vehicle operation manual.


    1. Additional requirements:
- to carry out maintenance of the Customer's vehicles according to the list of works agreed by the parties using their own spare parts and consumables within the framework of the Contractor's certificate;

  • provide a warranty period of six months for repairs performed and materials used;

  • provide the Customer with a copy of the order - order and invoice for the work performed;
- to carry out the supply of auto parts required for maintenance at the request of the Customer without prepayment;

In the event that hidden defects are discovered that require additional costs for the performance of repair work, the Contractor calls the Customer's representative and makes a written agreement on reasonable costs.

In the process of performing maintenance and repair work, the Contractor shall not be entitled to refuse to fulfill the order if it turns out that this repair is impossible by the Contractor's forces.

The consequences of poor-quality maintenance performed during the warranty period, the Contractor eliminates free of charge. The warranty period is determined by the contract.

Payment for the work performed and the used auto parts and consumables is made by the Customer upon the fact of the work performed or the delivery of auto parts by transferring funds to the Contractor's settlement account within 15 banking days from the date of signing the acceptance certificate for the services rendered.
3. Additional terms

3.1. The participant of the competition must have a service center for the maintenance of vehicles in the territory of Izhevka.

Terms of Reference prepared
Head of OMiT A.V. Mokhov

Terms of reference for the STO project

Builders need a project, designers need a design specification. The terms of reference is the material for the development of the project, coordination with authorities and consultations with architects.

Stages of work on the creation of a service station:

1) Development of terms of reference:

– choice of brand or brands of repaired cars;

– choice of types of work;

– definition of technological processes;

- determination of the expected output in paid standard hours and the expected workload of the repair shop;

– determination of routes for moving and parking vehicles in the workshop and on the territory before and after repair;

- the choice of equipment for diagnostics and repair, taking into account the requirements of the manufacturers of cars of the selected brand, the definition of installation stages, the definition of plans for expanding the types of repair work;

- determination of the size of the required space, taking into account the selected equipment and the number of posts;

– making a decision on the construction of a new building or the reconstruction of an existing one, if it can be purchased or rented;

- selection of a plot of land, if it is planned to build;

- determination of engineering support, taking into account the parameters of the building and equipment and plans for the development of service stations;

- technological planning.

2) Preparation of a business plan to justify the need for investments and the timing of their return, determining the costs of:

– design;

– coordination of the project in the authorities and obtaining the necessary permits;

– construction and purchase of building materials;

- engineering Communication;

– purchase and installation of equipment, furniture and office equipment;

- salary, taxes, etc.);

- working capital (to maintain the necessary stock of spare parts and materials for car repair).

3) Construction or reconstruction:

- selection of a contractor;

– control of execution of works;

- acceptance of the building;

– purchase and installation of equipment, furniture, office equipment.

4) Commissioning:

– certification of equipment and workplaces;

– development of a computer system;

– introduction of a system for accounting for the production of works, the consumption of materials and spare parts, control of payment;

– development of customer service technology;

- selection and training of personnel.

- remember about the "promotion": in the first months of orders there will be much less than the estimated volume, and this must be taken into account in the business plan.

The choice of a plot of land is the work of a specialist who will participate in the design and construction. He will analyze whether this area is able to withstand the load that the service station will exert on it and whether this area is suitable for it or not. If suitable, the specialist will sketch out a sketch of the area plan, the area with the “red line”, the available communications, options for their use, and estimate the costs of connecting to them.

When choosing equipment, it is important to decide on the equipment before starting work on the technological layout. Technological planning is carried out by some companies specializing in the supply of equipment for car service. The specialist will draw up a layout of the repair zones, their area and boundaries, where which post will be located inside these zones. So you get the basis of the terms of reference for designers. Add to it a plan for the placement of auxiliary, office and household premises, marking the territory, your requirements and wishes.

Technological processes of HUNDRED must be verified before the start of design and must not be changed. Processes are an integral part of the project and are coordinated in various instances. And if during the construction process you decide to buy other equipment or introduce new types of work, then you will have to repeat the entire approval process. Regardless of the stage of construction, the project will have to be redone, approved, because any changes in the approved project are reconstruction, and it requires even more permits. Therefore, it is important to check “seven times” when preparing sketches of the technological layout, whether the lifts, slipways, spray booth, compressor room will be placed in this way, whether it is better to make air intakes, ventilation, etc.

Design. The task of the designers is to develop a project taking into account all the requirements and wishes, standards and state standards.

Required Documentation

For technical specifications and design, the following documents are required:

- building plan, i.e. the official map of the land, usually on a scale of 1: 500 or 1: 1000;

- photographs of the site and the area adjacent to it, which show the surrounding buildings, the boundaries of the site, its connection with roads, the entrance to the site and, possibly, the altitudinal zoning of the area with marked contour lines;

- if the site is not flat, data on the altitudinal zoning of the area are needed;

- plans for connecting the site with the infrastructure of the area (actual state);

– building plan data, site boundaries, use, etc.;

– connection to the public road network, entry to and exit from the site, etc.;

- drainage of water from the site, its sewerage and high-altitude survey;

– drinking water supply;

– pipeline for gas supply;

- the main distributing pipeline for heating.

This information is necessary to identify the spatial possibilities of the territory and the capacity of individual buildings.

To clarify and assess the conditions for the construction of a service station, the following documents will be needed:

– certificate of land ownership and a map of the land plot;

– coordination of the location of the enterprise and regulatory conditions for construction (conclusion of the relevant department);

- the conclusion of the traffic safety inspectorate on a specific section in terms of the safety of entry / exit for traffic on adjacent streets;

- the conclusion of the relevant departments on the location of engineering networks (officially certified location of sanitary protection zones on the situational plan: distributing water lines, electrical networks, gas pipelines, long-distance communication lines);

– conclusion of ecological expertise from the point of view of environmental protection;

- in the case of reconstruction or completion - the current plans of existing facilities.

The cycle of design work includes:

1. Preparation of an urban planning justification for passing the regulatory commission of the Committee for Architecture, including:

– options for façade solutions, color schemes;

– explanatory note;

- landing of the building;

- situational plan;

– photomontage, perspective, axonometry, facades in axes, layouts.

2. Technical support for obtaining initial permit documentation.

3. Working draft (approved part) includes:

- architectural section;

- design section (KZh, KM);

– technological section;

– OB, ES, VC;

- special sections (GOChS, traffic police, environmental protection).

4. Design documentation.

To speed up the process of preparing documents, the design and construction company undertakes the work of coordinating the design stages in the relevant authorities, if desired, the customer can carry out the coordination himself.

General requirements

A service station must make a favorable impression on customers. The car service market is expanding every day and consumers can already choose between service stations. A client who has arrived for the first time evaluates, first of all, the convenience of the entrance, the presence of a clearly marked parking lot and its minimum distance from the reception area of ​​the service station. Cleanliness, visibility and some chic already on the way to the enterprise are usually noted by customers. Once in the reception area, the client already feels goodwill or uncomfortable atmosphere.

When designing new workshop facilities, sufficient time must be devoted to exhaustive research, as such design and construction is a once-in-a-lifetime experience for most firms. Unsuccessful design, architectural and design decisions can have long-term negative consequences. When designing, development prospects for 10 years are taken into account, it must also be remembered that the layout of the service station should provide for ideal suitability for operation, economic return on investment, and customer satisfaction. Adaptability to function implies the performance of work in the proper premises.

Customer orientation means that the premises and their equipment must:

- make a favorable impression on the customer;

– be “light and airy”;

– to attract customers, causing them to want to visit them again.

In the architectural implementation of these goals, the following circumstances should be taken into account:

- development of the city and its environs;

– the best performance of operational functions;

– general layout and architectural design of the interior;

- building standards established for a given area in an agreed district planning plan;

– construction costs and operating efficiency, including economic return on investment;

– placement of company identification elements;

– statutory requirements for environmental protection.

Attractive buildings, interiors, comfortable workplaces, comfortable social spaces - these are very valuable “fixed assets”, serious factors for attracting staff and customers. Good premises and a vigorous marketing policy contribute to a successful business. Premises should be considered from the point of view of both customers, and employees, and managers.

Customers need the building to be conveniently located, accessible for entry and exit from the street, have easy access to a maid hall, a service receptionist, a counter selling spare parts, a cash register, a comfortable waiting room, a bar or a cafe. Employees need a comfortable environment where they can enjoy working. In order for the work to proceed in close cooperation, it is necessary to create conditions under which it is easy to get from each department to another. Managers need rooms from which to observe and control production operations. The dimensions of the building and premises are determined taking into account the projected scale of the activities of each service.

Small service: workshop from 10 x 15 m; usable area (shop, reception, rest room, warehouse, auxiliary premises) from 5 x 25 m.

Total area: 250 sq. m. A smaller area is allowed, but with the obligatory presence of two (for a service with a guarantee - four) jobs (posts - 3.75 x 5.0 m) for the car.

Average service: workshop from 12.5 x15 m.; usable area from 7.5 x 25 m. Total area - 375 sq. m. m.

Major service: workshop from 10 x 30 m; usable area from 20 x 22.5 m. Total area - 750 sq. m. m.

The practice of designing small services has shown that they need the following areas:

For car service companies:

- tire fitting 1 post - 27.5 sq. m.;

- tire fitting 2 posts - 64.2 sq. m.;

– tire fitting 4 posts – 210 sq. m.;

- wheel alignment 1 post - 46.2 sq. m.;

- tire fitting + gathering / collapse - 51.21 sq. m.;

- MOT and TR + tire fitting + gathering / collapse (3 posts) - 149 sq. m.;

- MOT and TR + gathering / collapse (4 posts) - 180 sq. m.;

- MOT and TR + tire fitting + gathering / collapse (5 posts) - 291.36 sq. m.;

- sink (2 posts) - 80 sq. m.;

- MOT and TR + diagnostics (1 post) - 63 sq. m.;

- MOT and TR + washing + tire fitting + gathering / collapse (5 posts) - 192 sq. m.;

- MOT and TR + tire fitting + oil change (6 posts) - 360 sq. m.;

- MOT and TR + gathering / collapse (6 posts) - 380 sq. m.;

- painting and body shop (3 posts) - 210 sq. m.;

- painting and body shop (5 posts) - 220 sq. m.

For truck service companies:

– cargo car service, tire changer (1 post) – 28 sq. m.

- Cargo car service, tire shop (3 posts) - 224 sq. m.

- truck service. MOT and TR (6 posts) - 324 sq. m.

Territory

The most important parameter is the size plot: they try to acquire as much as possible, taking into account the prospects for business development. Usual requirements: 100 sq.m. m of all premises, 100 sq. m plus 100 sq. m of reserve territory. Lot size and area requirements need to be carefully considered as they are important for design and investment.

It is very important to assess the development prospects so that, if it is necessary to expand the workshops, there are sufficient spare areas. The total area of ​​the plot of land required for construction consists of the sum of the areas of the necessary car service units. The area of ​​the building and the usable area of ​​the territory (parking, vehicle maneuvering area, area in front of the entrance-exit, area for special use) should be able to be developed. A ratio of 1/5 to 4/5 between the area of ​​the building and the free area is recommended. Possibility of better economic development - with a square or rectangular shape of the land. At the same time, the ideal size of the land plot is 50 x 60 m.

Location site affects the result of commercial activity to a large extent. When choosing a land plot, you need to keep in mind the following criteria. When choosing a site for the construction of a new building for a dealership, five main aspects are taken into account: site, conditions, configuration, size, costs.

Also take into account:

- various restrictions in force in the area: for construction, for digging, for fencing, etc.;

- a plan for the development of a residential area, a shopping area, a business area, a plan for possible redevelopment of sites, etc.;

– a plan for the construction of new roads and changes in the regulation of traffic flows;

The distance from the enterprises servicing trucks and buses (from the boundaries of their land plots) to residential buildings and public buildings should be taken:

- trucks and buses of urban transport - 100 m;

- cars, except for cars owned by citizens, and buses - 50 m.

STO should be easy all infrastructure is available: electricity, water, heat supply, sewerage, telephone, public transport, etc. It is desirable that the service station be located near a busy place: mall, shop or gas station. This location is the most convenient for customer service. Advantages in location have a positive effect on business.

Availability. It is important that the station can be reached by public transport. It is convenient for clients to visit the firm if it is located at an acceptable distance or close to business, residential or commercial areas. Entry and exit to the territory of the service center must be unhindered.

The value of the site. When choosing a site, you need to take into account its value in terms of advertising and its increase after construction. Along with the size of the land plot, its configuration. The rectangular shapes of the plots not only provide good conditions for their use, but are also more suitable in terms of operating costs.

Fit for purpose. A special role is played by the convenience of the land for construction. The following criteria are taken into account:

– the site must be protected from floods, earthquakes, landslides, etc.;

- the site must be at the level of the adjacent road;

- it is better to choose a site that is flat or with a slight slope (from 1 to 2%), so that expensive land movement is not required during planning;

- Sloping or uneven areas require higher amounts for financing the preparation of the territory (preparatory work, area planning with a bulldozer, soil removal, retaining walls, underground garages, etc.);

- preferably a solid base, i.e. compacted soil of medium, even good quality.

Expenses. In cities, there are often no plots of land of the required size that are suitable for the construction of service stations, and if they are, then high prices greatly increase costs. When choosing a suitable land plot, the price certainly plays an important role, but one should not forget about the criteria of “location” and “suitability” of the site.

A very important factor is the cost of construction preparation. These are usually the costs of:

– construction of roads (access roads and parking lots),

- construction of sanitary facilities (sewerage, connections to the water supply network, electrical inputs, main line for heating distribution, lighting of access roads, etc.).

In the fencing of the territory of the enterprise, which provides for 10 or more posts or storage of 50 or more vehicles, at least two entrances (exits) should be provided. For enterprises with a smaller number of posts or car storage places, a single entrance to the territory is allowed. The opening of the gate in the fence must be at least 4.5 x 4.5 m. The gate of the main entrance to the territory of the enterprise should be placed indented from the “red line” at a distance of at least the longest model of the rolling stock, including road trains. In front of the gates of the main entrance to the territory of the enterprise, a storage area with a capacity of at least 10% of the maximum hourly number of rolling stock arriving at the enterprise should be provided. When the territory of the enterprise is located on a land plot limited by two public passages, the gates of the main entrance should be placed on the side of the passage with the lowest traffic intensity. Entry into the territory of the enterprise must precede the exit, counting in the direction of movement along the public passage. On the territory of the enterprise with the number of 10 or more posts or 50 or more places for storing cars, the movement of vehicles should be provided in one direction without oncoming and intersecting flows. On the territory of the enterprise, regardless of its capacity, oncoming and crossing traffic of vehicles is allowed at their intensity of not more than 5 vehicles per hour.

Industrial premises The construction project should reflect labor protection measures, as well as sanitary and hygienic working conditions, indicating the expected levels of exposure to harmful production factors for workers, methods for controlling their impact and measures to protect workers, including decisions to normalize microclimate parameters and illumination of workplaces, reduction of industrial noise and vibration levels, gas pollution and dustiness of premises, electromagnetic radiation, electrostatic field, etc.

Building structure The determining factor for determining the height of the service station are the functional heights of the workshop and spare parts warehouse. The clear height of the workshop and spare parts warehouse is measured to the crossbeams. Vehicle repairs require a height of 4.3 m (assembly space below the lower edge of the cross member). At the spare parts warehouse, this height is obtained from two 2.1 m high racks placed one above the other and from an assembly space of at least 10 cm high under the lower edge of the crossbeam. This determines the same height of the workshop and spare parts warehouse.

This text is an introductory piece. From the book Small Auto Business: Where to Start, How to Succeed author Volgin Vladislav Vasilievich

Terms of reference for the Autodrom project - a sports and technical complex on an area of ​​25 hectares or more, with a developed infrastructure, a hotel, a sports village to accommodate participants in competitions and events. The project must comply with all applicable

From the book Quality Management. Workshop author Rzhevskaya Svetlana

13 Examination of the final version of the draft standard. Preparation of a draft standard for approval 13.1 General requirements for preparing a draft standard for approval

From the book Information Technology and Enterprise Management author Baronov Vladimir Vladimirovich

Definition of the project In domestic practice, this concept until recently was used mainly in the technical field. The project usually meant the development of documentation for the creation of any buildings or structures. And the development process

by Jeston John

Project Sponsor The role of a project sponsor is a common one for a business project. Often the lead business manager acts as a sponsor. The sponsor of the project should be an active supporter and advocate of the project, having the following duties and being responsible for: identifying and

From the book Business Process Management. A Practical Guide to Successful Project Implementation by Jeston John

Project Director The Project Director is responsible for all activities related to the project. The project manager(s) and the project work line managers report directly to the project director. This role ensures the implementation of the project

author Newton Richard

Step 1.3. Project Customer The existence of a project a priori assumes that there is a certain person interested in its implementation. In project management terminology, this person is referred to as the project sponsor. This customer can be you, your boss, a customer, or

From the book Project Management from A to Z author Newton Richard

Step 1.4. Project team Any project consists of many tasks that need to be solved. In small projects, the functions of a manager and a direct executor can be performed by one person. In larger projects, this is not possible: at various stages of the life cycle

From the book Project Management from A to Z author Newton Richard

Step 4: Implementation of the project Step 4.1. Start a project Projects don't start on their own once you've developed a plan. It is necessary to give an appropriate signal to the team. But before that, it is desirable to hold a final meeting with the customer, during which it is necessary to: approve

From the book Project Management from A to Z author Newton Richard

Step 5: Completing the project Step 5.1. Test the finished product The customer has the right to expect that the finished product will meet the requirements put forward by him. To this end, before handing it over to the customer, testing is carried out, of course, in accordance with the type

author Abrams Rhonda

Project selection For which enterprise are you going to write a business plan? Some classes or competitions offer a limited selection of types of enterprises for the project as a task, but more often there are a great many options. Since the quality of your

From the book Business Plan 100%. Strategy and tactics of effective business author Abrams Rhonda

1. Summary of the project 1.1. Project initiator Initiator: LLC "XXX" Legal form: limited liability company. Year of foundation: 2007. Head: Ivanov Ivan Ivanovich. Main activity: production

From the book Business Plan 100%. Strategy and tactics of effective business author Abrams Rhonda

1.1. Project initiator Initiator: LLC "XXX" Legal form: limited liability company. Year of foundation: 2007. Head: Ivanov Ivan Ivanovich. Main activity: production

From the book Business Plan 100%. Strategy and tactics of effective business author Abrams Rhonda

1.2. The purpose of the project The purpose of the project is to diversify activities by providing services to corporate clients. To do this, a new company is created with founders who are part of the LLC

From the book Business Plan 100%. Strategy and tactics of effective business author Abrams Rhonda

2. Description of the project 2.1. General Information Limited Liability Company "XXX" was established in 2007 in accordance with the Federal Law "On Limited Liability Companies". Legal (postal) address: Moscow, st. Dubninskaya, d.

From the book Stop paying for everything! Cost reduction in the company author Gagarsky Vladislav

Organization of the project If we consider cost reduction as a project, then for its implementation it is inappropriate to create some regular organizational units, but it is better to create temporary working groups. During the project, employees participate in the following roles (Tab.

From the book Illumination. How to go beyond the familiar and see new business opportunities in change author Burrus Daniel

Launching the project When I was developing the business concept in August 2009, one person who considered himself a big connoisseur of the smartphone app market said: “If you are going to get into this business, you are too late - all the best applications have already been written.” I just smiled at

Let's analyze the terms of reference for the purchase of services for the maintenance and repair of warranty vehicles.

Let's analyze the following situation. It is planned to purchase services for . The terms of reference include the following provisions:

Technical and qualitative characteristics of services, the procedure for the provision of services:

The contractor must be an official representative of the manufacturer and have a dealer agreement for a warranty. If the Contractor is not an official dealer, he has the right to involve co-executors from among the official dealers in the provision of services. The Contractor shall be liable to the Customer for the consequences of non-fulfillment or improper fulfillment of obligations by subcontractors.

The ongoing maintenance should not lead to the removal of vehicles from the manufacturer's warranty service.

When performing maintenance, the Contractor must make notes on the relevant pages of the vehicle service book about the maintenance.

The quality of vehicle maintenance must comply with the requirements of the current legislation of the Russian Federation, Decree of the Government of the Russian Federation dated April 11, 2001 No. 290 (as amended on January 23, 2007) “On approval of the Rules for the provision of services (work) for the maintenance and repair of motor vehicles”, GOST R 51709 -2001, the Federal Law "On Road Safety" dated December 10, 1995 No. 196-FZ and should not violate the warranty obligations and operational documentation of the manufacturer.

Maintenance must be performed by the Contractor at a service station located within the city of Rostov-on-Don.

Maintenance must be performed on time, in full, with the proper level of quality and meet the requirements of the Customer specified in this documentation.

Service quality requirements:

Read the latest comments on hot topics in the field of public procurement in magazine "Goszakupki.ru"


Terms and conditions for the provision of services: Maintenance and repair of vehicles is carried out as necessary at the request of the Customer. The Contractor is obliged to accept the Customer's cars in an extraordinary manner. The Contractor is obliged to start work on the day of the Customer's request. Works are carried out within three working days from the date of application by the Customer. The commencement of work may be delayed by agreement of the parties for the period of delivery of spare parts, but not more than 14 days.

Place of provision of services : on the technical base of the Contractor (SRT, service center) in Tyumen.

Service quality requirements: The contractor performs maintenance and repair of the customer's vehicles in accordance with the established operating and repair standards, recommendations of the manufacturer, in strict accordance with the requirements of state standards, specifications, sanitary standards, in compliance with the requirements of the "Rules for the provision of services (performance of work) for maintenance and repair of motor vehicles”, approved by Decree of the Government of the Russian Federation No. 290 dated April 11, 2001, taking into account the provisions of the contract. When performing work, only operating fluids, consumables and spare parts provided by the manufacturer may be used. Installed spare parts and consumables must be new, that is, not used, not remanufactured, free from defects in material and workmanship, not altered, not damaged, without any restrictions (deposit, ban, seizure, etc.) to free circulation on the territory of the Russian Federation. All spare parts and consumables are included in the cost of work. The quality of the installed spare parts for vehicles must comply with the standards in force in the Russian Federation, technical conditions, safety requirements and be accompanied by certificates of conformity issued by the body of the GOST certification system of the Russian Federation.

Technical requirements:

1. Works are performed by the Contractor with the obligatory use of:

Working capital of original spare parts and materials for the repair and maintenance of ZIL, KamAZ, GAZ vehicles; non-original spare parts may only be used with the consent of the Customer.



bodywork area;

Tire works area;

The contractor must perform the full range of maintenance and repair work, including:

Urgent repair;

Carrying out periodic warranty maintenance of the car;

Locksmith work on the repair and replacement of components and assemblies of the car;

Electrical works;

Diagnostic and adjustment work of vehicle systems and units;

Work on the replacement of lubricants, special fluids and filter elements;

Tire fitting, tire repair and balancing works;

Work on adjusting the angles of the wheels;

Body and painting works;

Works on installation of additional equipment of cars;

Cleaning and washing works;

Other jobs.

2. Maintenance and repair of motor vehicles must be carried out in accordance with the current time standards and the established technology of the manufacturer.

3. The contractor is obliged to ensure the reception of the car without prior appointment, on the day of the request.

4. The delivery time for spare parts to order is no more than 14 working days from the date of receipt of the Customer's application.

5. The elimination of defects in the work is carried out by the contractor free of charge within 3 days from the date of detection of the malfunction by the customer. In the event of unscheduled work on the urgent repair of official vehicles that have failed for technical and other reasons, the contractor is obliged to provide conditions for repairing the vehicle within 2 days.



6. The Contractor bears full financial responsibility for the safety of the Customer's car during the entire time the car is with the Contractor.

Mechanism and conditions of warranty service

Requirements for the provision of warranty obligations, the terms for providing a guarantee of the quality of work:

For original spare parts - at least six months or at least 10,000 km, whichever comes first;

For the engine - at least two months or at least 12,000 km, whichever comes first;

Checkpoints, RK, bridges for cars - at least two months or at least 10,000 km, whichever comes first;

For spare parts - at least 14 days or 1000 km, whichever comes first;

For work, services:

Maintenance and repair - at least one month or at least 3000 km of run;

Tin-welding and painting works - at least six months;

Body work - at least six months;

Electrical work - at least six months;

Locksmith work - at least six months.

The warranty period is calculated from the moment of signing by the Customer and the Contractor of the certificate of completion.

Customer executive:

_________________ V.V. Vagina __________________ /

Application №2

Terms of reference for the performance of work

for the repair of cars of the brand LADA 211140 and VIS234610-30.
1. Name, characteristics and scope of work performed, requirements established by the customer for quality, technical characteristics of services, their safety, functional characteristics (consumer properties):

The Contractor must carry out car repair work on his own and with the use of materials and spare parts of the Contractor.

The quality of the provided parts and spare parts, materials and components used in the provision of car repair services must comply with GOST, TU and the standards established by the legislation of the Russian Federation. Spare parts and consumables for cars used by the Contractor must be new and only factory-made.

It is necessary to have certificates of conformity of parts and spare parts, materials and components used in the provision of car repair services to GOST, TU, and the norms established by the legislation of the Russian Federation. Compliance of the equipment used in the performance of services with the requirements of the manufacturer, as well as the availability of certificates for installed spare parts and parts.

Car repairs are carried out at the location of the Contractor, on its site. Delivery of cars to the place of repair and back is carried out by the forces and means of the Customer. The Contractor bears all costs and assumes all risks from the moment the cars are accepted for repair until the Customer picks up the cars from the repair. The day of completion of the provision of repair services is the day of signing by the Customer and the Contractor of the act of services rendered. Other conditions are stipulated by the Parties in the relevant clauses of the civil law contract.

Work must be carried out in accordance with the requirements of the repair manual and the regulatory documentation of the vehicle manufacturer.

2. Place of provision of services: Samara, at the location of the service center.

3. Terms of services: from the date of conclusion of the Agreement within 5 (five) business days.

^4. Warranty period:

For consumables, components, a warranty period corresponding to the standards of the manufacturer.

car LADA 211140.


No. p / p

Name of works, description of services

Unit rev.

Qty

1

Replacing the front struts 2pcs.

service

1

2

Replacing the upper supports

service

1

3

Replacing the front springs

service

1

4

Rear spring replacement

service

1

5

Replacing lever bushings

service

1

6

Replacing stabilizer struts

service

1

7

Replacing front brake discs

service

1

8

Replacing the front brake pads

service

1

9

Replacement grenades internal 2pcs.

service

1

10

Replacing rear shock absorbers

Service

1

11

Replacing rear brake drums

service

1

12

Replacing the rear pads

service

1

13

Handbrake cable replacement 2 pcs.

service

1

14

Replacing the brake cylinder rear 2pcs

service

1

15

Changing the oil in the gearbox

service

1

16

Brake Fluid Replacement

service

1

17

Clutch cable replacement

service

1

18

Replacing engine bearings set

service

1

19

Clutch replacement

service

1

20

Caliper replacement 2pcs.

service

1

21

Starter Replacement

service

1

22

Generator replacement

service

1

23

Replacing the DMRV sensor

service

1

24

Replacing the stove radiator

service

1

25

Heater motor replacement

service

1

26

Fuel pump replacement

service

1

27

Washing nozzles

service

1

28

Gas tank replacement

service

1

29

Remove/install gearbox

service

1

30

Gearbox repair

service

1

31

Replacement of external grenades 2 pcs.

service

1

32

Camber/convergence

service

1

^ List of performed repair works

car VIS 234610-30.


1

Replacing springs 2pcs.

service

1

2

Replacing the front springs

service

1

3

Replacing front shock absorbers

service

1

4

Replacing upper arms

service

1

5

Replacing lower arms

service

1

6

Replacing bushings of springs

service

1

7

Rear brake pad replacement

service

1

8

Replacement of crosspieces 4 pcs.

service

1

9

Front brake pad replacement

service

1

10

Replacement of ball bearings 4pcs.

service

1

11

Replacing rear shock absorbers

service

1

12

Alternator Belt Replacement

service

1

13

Power steering belt replacement

service

1

14

Replacement of antifreeze

service

1

15

Oil change

service

1

16

Oil filter replacement

service

1

17

Air filter replacement

service

1

18

Fuel filter replacement

service

1

19

Fuel pump replacement

service

1

20

Spark plug replacement

service

1

21

Oil change gearbox, bridges, transfer case

service

1

22

Replacement wiper blades

service

1

23

Seat belt replacement

service

1

24

ICE diagnostics

service

1

25

Bulb replacement

service

1

26

Replacing the front left side member with painting

service

1

27

Front brake hose replacement

service

1

28

Steering gear replacement

service

1

29

Replacing the master brake cylinder

service

1

30

Steering trapezoid replacement

service

1

31

Steering pendulum replacement

service

1

32

Replacing the stove radiator

service

1

33

Camber/convergence

service

1

Agreed:
Chief engineer E.M. Kudryashov